
Trade and Development Bank
Server Room: Raised Floor and Modular UPS
A raised floor and cable routes for the Trade and Development Bank's server room, plus modular Galaxy VS UPS units with bypass panel and power modules.

What We Did
- Raised floor pedestals, cutting, framing and drainage
- Under-floor and wall cable routes, inter-floor ducts
- Galaxy VS UPS, bypass panel and power module installation
From the Site
Planning a similar project?
Our engineers will study your needs and propose a solution, from design through to maintenance.


